Relocation of Sha Tin Sewage Treatment Works to Caverns
This dedicated website is prepared in accordance with the requirements in the Environmental Permit (EP)(EP No. EP-533/2017A) and is intended to enable user-friendly public access to project information for the Relocation of Sha Tin Sewage Treatment Works to Caverns and the associated environmental monitoring data.
Relocation of Sha Tin Sewage Treatment Works to CavernsProject Description
Project BackgroundThe Relocation of Sha Tin Sewage Treatment Works to Caverns (the Project) is a designated project under the Environmental Impact Assessment Ordinance (EIAO) for which Environmental Impact Assessment (EIA) report and Environmental Monitoring and Audit (EM&A) Manual was approved by Environmental Protection Department (EPD) (Reg. No.: AEIAR-202/2016). The Environmental Permit (EP) has been issued by EPD (EP No. EP-533/2017 and its variation EP-533/2017A). More details of the Project can be found in the project main website (http://www.ststwincaverns.hk/").
OverviewThis Internet website is prepared according to the requirements of the EP-533/2017 and its variation EP-533/2017A. It is to provide the user-friendly public access to the relevant project information and environmental monitoring and audit data for the Project.
Contract No. DC/2018/05 Relocation of Sha Tin Sewage Treatment Works to Caverns - Site Preparation and Access Tunnel Construction [Completed]Contract No. DC/2018/05 is the first contract under the Project. The main construction works under Contract No. DC/2018/05 included site preparation works at the main access tunnel portal area, construction of a section of main access tunnel leading to the proposed cavern complex at Nui Po Shan and construction of an access road leading to the proposed ventilation shaft.
Contract No. DC/2020/05 Relocation of Sha Tin Sewage Treatment Works to Caverns - Main Caverns Construction [Ongoing]Contract No. DC/2020/05 is the second contract under the Project. The works include the following:• Construction of a main caverns complex at Nui Po Shan of about 14 hectares in area; • Construction of about 260 m long secondary access tunnel; • Construction of a ventilation shaft of about 70 m deep and a ventilation adit of about 660 m long; • Construction of two effluent pipes of about 2.2 m in diameter and about 320 m long; • Other site formation works and other related works.
Contract No. DC/2023/12 Relocation of Sha Tin Sewage Treatment Works to Caverns – Ancillary Buildings, Cavern Ventilation System and Associated Works [Ongoing]Contract No. DC/2023/12 is the third contract under the Project. The works include the following:• Construction of two ventilation buildings and other related buildings; • Construction and installation of the cavern ventilation system and associated electrical system; • Construction of emergency bypass; • Other related works. |
Relocation of Sha Tin Sewage Treatment Works to CavernsProject Profile• https://www.epd.gov.hk/eia/register/profile/latest/esb273/cover.html |
Relocation of Sha Tin Sewage Treatment Works to CavernsEIA Report• Refer to the link under EIAO websitehttps://www.epd.gov.hk/eia/register/report/eiareport/eia_2402016/cover.html |
Relocation of Sha Tin Sewage Treatment Works to CavernsEnvironmental Permit• https://www.epd.gov.hk/eia/register/permit/latest/vep6182022.htm |
Relocation of Sha Tin Sewage Treatment Works to CavernsEM&A Manual• PDF versionhttps://www.epd.gov.hk/eia/register/english/permit/ep5332017/documents/uemam/pdf/uemam.pdf |
Relocation of Sha Tin Sewage Treatment Works to CavernsEP SubmissionsProject Submission Under EP:• EP-533/2017 https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html • EP-533/2017/A https://www.epd.gov.hk/eia/english/register/index8/vep6182022_content.html |
Relocation of Sha Tin Sewage Treatment Works to CavernsBaseline Monitoring ReportBaseline Monitoring Report• Baseline Air and Noise Monitoring Report https://www.epd.gov.hk/eia/register/english/permit/ep5332017/documents/blanmr/pdf/blanmr.pdf • Baseline Survey Report on Egretry https://www.epd.gov.hk/eia/register/english/permit/ep5332017/documents/blsr/pdf/blsr.pdf • Baseline Marine Water Quality Monitoring Report https://www.epd.gov.hk/eia/register/english/permit/ep5332017/documents/emar202104v33a/pdf/emar202104v33a.pdf • Baseline Noise Monitoring Report for Demolition of Existing Sha Tin Sewage Treatment Works (STSTW) https://www.epd.gov.hk/eia/register/english/permit/ep5332017/documents/blmarr1/pdf/blmarr1.pdf • Baseline Monitoring Report for Rock Processing Plant at Ngau Kok Wan https://www.epd.gov.hk/eia/register/english/permit/vep6182022/documents/blaqmrrb/pdf/blaqmrrb.pdf |
Relocation of Sha Tin Sewage Treatment Works to CavernsEM&A ReportMonthly Quarterly |
Relocation of Sha Tin Sewage Treatment Works to CavernsEM&A DATA
|
Relocation of Sha Tin Sewage Treatment Works to CavernsContact UsPlease voice your enquiries or opinions by :Email : pr@stc-aecom.com Hotline : (852) 5220 0180 Fax : (852) 2251 0693 Mail : PRE’s Site Office, 3 Shui Chong Street, Shatin, N.T. Useful Link Project Main Website: http://www.ststwincaverns.hk/ |